Calls and texts
Every call is logged as a contact and a summary. This view does not dial.
Texting pending
Riley still answers calls. Texts are held until A2P is ready. Nothing is sent.
Furnace is short-cycling. Hannah wants a replacement price before she books a tech. Riley saved the lead and left the estimate open.
Main line is backing up at the cleanout. Chris sent photos. Riley held 3:30 today for a look and opened a drain takeoff.
Upstairs is not cooling. Riley booked the service crew for 11:30 today at 910 Cedar Lane and started the day 0 text.
Water heater is dripping from the base. Elena shut the supply off. Riley booked the service crew for 2:00 PM today on Maple Street.
Marco wants a softener quote, not a same-day repair. Riley placed a Wednesday hold and marked the lead qualified.
Priya confirmed the bath walkthrough. The job has since wrapped, and she replied to the review ask this morning.
Panel is warm to the touch. Riley booked the install crew for Monday morning and the job is on site today.
Owen Blake
(512) 555-0181 · 7:02 AM
Morning Owen. The install crew is on Lantern Drive between 8 and 10 for the panel. Reply here if the gate code changed.
Open leadElena Brooks
(512) 555-0148 · 8:16 AM
You are booked today at 2:00 PM for the water heater at 1842 Maple Street. The service crew has the shutoff note.
Open leadNoah Patel
(512) 555-0172 · 9:05 AM
Confirmed for 11:30 today at 910 Cedar Lane. Upstairs is not cooling. The service crew will text when they are ten minutes out.
Open leadChris Alvarez
(737) 555-0194 · 10:46 AM
Photos received. You are held for 3:30 today at 77 Pecan Court so we can price the drain before any repair.
Open leadPriya Shah
(512) 555-0155 · Thu 4:10 PM
The bath at Lakewood is wrapped. If you have a minute, tell us how the install crew did.
Open leadWater heater leak · (512) 555-0148
Next send Sat 8:00 AM
Step 1
Day 0 confirmation
Fri 8:16 AM
Step 2
Day 1 reminder
Sat 8:00 AM
Step 3
After-job review ask
After the visit
AC not cooling · (512) 555-0172
Next send Sat 8:00 AM
Step 1
Day 0 confirmation
Fri 9:05 AM
Step 2
Day 1 reminder
Sat 8:00 AM
Step 3
After-job review ask
After the visit
Main drain backup · (737) 555-0194
Next send Sat 9:00 AM
Step 1
Day 0 confirmation
Fri 10:46 AM
Step 2
Day 1 reminder
Sat 9:00 AM
Step 3
After-job review ask
After the visit
Panel upgrade · (512) 555-0181
Next send When the panel is closed
Step 1
Day 0 confirmation
Mon 2:08 PM
Step 2
Day 1 reminder
Tue 7:30 AM
Step 3
After-job review ask
When the panel is closed
Bath remodel · (512) 555-0155
Next send Sequence finished
Step 1
Day 0 confirmation
Tue 11:22 AM
Step 2
Day 1 reminder
Wed 8:00 AM
Step 3
After-job review ask
Fri 7:48 AM